Suche

Concept Therapy Institute Interconnect

Ausschreibung

Allgemeine Informationen

Vereinigte Staaten
   ti:co-00108-gc, 16-6010
   Apr 21, 2017
   Apr 27, 2017
   Englisch
   andere

Kontakt

   PO Box 2449 2800 U.S. Hwy 281 N, Customer Center Building City: San Antonio, TX, 78298-2449 Attn: Gina Cappa (Contract Administrator)
Vereinigte Staaten
   +1-210-704-7297

Güter, Baumaßnahmen und Leistungen

Nebenarbeiten für Wasserrohrleitungen  

Originaltext

      
Tenders are invited for construction of approx. 1,250 lf of 8" dia pvc waterline from the existing pz 12 12" dia pvc waterline; approx. 760 lf of 8" dia waterline from the existing pz 12 12" dia pvc waterline; 2 ea of 2" pressure reducing valves (prv) at both connection locations; and fire hydrants on the proposed 8" dia waterlines and other appurtenant work. see attached file for complete scope of work. Bid date & time: 04/27/17 10:00 am Notes: written question deadline: 04/19/17 by 4:00 pm. a non-mandatory pre-bid meeting will be held at 10:00 am (ct) on april 17, 2017 at the san antonio water system~s customer service building, 1st floor, conference room cr-c145, 2800 u.S. hwy 281 north, san antonio, texas. this project has a "prevailing wage" requirement. Est. low value: $594,000 Est. high value: $594,000 Bond: 5% bid bond Prebid: 04/17/17 10:00 am

Related documents:

http://d.infostores.biz/T38887240.html?id=Nzg5QTFyJBQ2KC4CVxxCdVwyfDkYFzUvUBFSYg==
Diese Ausschreibung dient nur zur Information.
Auch wenn wir stets bemüht sind, immer aktuelle und genaue Informationen Ihnen zur Verfügung zu stellen, können wir keine Garantie auf Richtigkeit der Inhalte übernehmen.
Wenn Sie Aktualisierungen/Korrekturen für diese Ausschreibung haben, bitte informieren Sie uns.