Design and Build of Additional Groundwater Storage and Transmission Pipelines and UFW Reduction Works

Qualifizierungsverfahren

Allgemeine Informationen

   Maputo and Matola
   FIPAG/MWSP-E/W-07/18
   Jan 7, 2019
   Qualifications requirements include: the minimum average annual construction turnover within the last 5 years shall be EUR 16,000,000.00 calculated as total certified annual payments received for contracts in progress and/or completed. Experience under construction contracts in the role of prime contractor, JV member, sub-contractor, or management contractor for at least the last 5 years, prior to the applications submission deadline. Participation as a prime contractor, joint venture member, management contractor or sub-contractor, in at least 3 contracts within the last 10 years, 2 with a value of at least EUR 6,000,000 and 1 contract with a value of at least EUR10,000,000.00. The similarity shall be based on the physical size, complexity, methods/technology or other characteristics as described in Section III, Evaluation and qualification criteria.
   Englisch
   internationalen Ausschreibungen

Kontakt

   Antonio Vilanculos
Engineer
FIPAG - Fundo de Investimento e Património do Abastecimento do Abastecimento de Água
Maputo-Mozambique
Maputo
Mosambik
   +258828247660
   Klicken Sie hier
   http://www.fipag.co.mz

Additional resources

Originaltext

Diese Ausschreibung dient nur zur Information.
Auch wenn wir stets bemüht sind, immer aktuelle und genaue Informationen Ihnen zur Verfügung zu stellen, können wir keine Garantie auf Richtigkeit der Inhalte übernehmen.
Wenn Sie Aktualisierungen/Korrekturen für diese Ausschreibung haben, bitte informieren Sie uns.