Suche

Execution Of The Works To Improve The Efficiency Of The Water Supply Of Mollet De Peralada, Consisting Of The Replacement Of The Water Distribution Network On The Street Of The Square, The Installation Of A Sectorization Meter Integrated Into The Tele -Style System, The Rehabilitation Of The Pressure Group, The Replacement Of The Associated Hydraulic Elements (Such As Collectors And Sectioning Valves) And The Partial Replacement Of The Impulse, And The Partial Replacement Of The Pipe, Municipal Water Supply And Reduce Water Leaks In The Low Urban Distribution Network, Maximize Water Savings And Increase System Guarantee.

Auftragsvergaben

Allgemeine Informationen

   Girona
   Mär 20, 2025
   Spanisch
   andere
85677 EUR
   veröffentlicht: Mär 20, 2025

Originaltext

If you would like to be notified of any news regarding this bid, please register on the State Contracting Platform homepage.




Start session

  




Register













if (hX_6) hX_6.AJAX_prototypeloader();if (hX_6)...
Abonnement

Basic

Voll

Corporate

US$550/Jahr

US$1000/Jahr

Price auf Anfrage

Kaufen Kaufen Schreiben Sie uns

Contract award information

   PROVEÏMENTS D'AIGUA S.A.
Diese Ausschreibung dient nur zur Information.
Auch wenn wir stets bemüht sind, immer aktuelle und genaue Informationen Ihnen zur Verfügung zu stellen, können wir keine Garantie auf Richtigkeit der Inhalte übernehmen.
Wenn Sie Aktualisierungen/Korrekturen für diese Ausschreibung haben, bitte informieren Sie uns.