Grange - Lindale Road Flood Alleviation Project Phase 2 (Completion)

Auftragsvergaben

Allgemeine Informationen

Vereinigtes Königreich
   WAFC001-DN720883-40784172
   Apr 25, 2025
Westmorland and Furness Council
   Englisch
   andere
650000 GBP
   veröffentlicht: Apr 25, 2025

Kontakt

   Gwyneth Timson
Westmorland and Furness Council
South Lakeland House Lowther Street Kendal LA9 4DQ England
England
Vereinigtes Königreich
   +44 1768212268
   Klicken Sie hier

Güter, Baumaßnahmen und Leistungen

Wasserbauarbeiten

Additional resources

Contract award information

   Cubby Construction Ltd.

Zusammenfassung

      

notice_summary_english: The Works include the design and construction of pumps and pipeline to deliver flood water from the wet well in Windermere Road car park in Grange to the pond in the Ornamental Gardens on Lindale Road.
The Council is the Local Lead Flood Authority responsible for surface water and ground water flooding in the County. As part of this remit, the Council has been developing flood alleviation measures for Grange-Over-Sands.
Phase 2 works involve the construction of a new laying a 710mm OD PE rising main 170m long from the pumping station within the Windermere Road car park into the carriageway of Windermere Road, crossing Lindale Road and into the Ornamental Gardens to discharge into the pond; (note the civil work has been constructed by others as part of Phase 1). It will be necessary to complete the outstanding civil works to the pumping station and continue with pump installation and commissioning.
local_title: Grange - Lindale Road Flood Alleviation Project Phase 2 (Completion)
notice_contract_type: Works
local_description: The Works include the design and construction of pumps and pipeline to deliver flood water from the wet well in Windermere Road car park in Grange to the pond in the Ornamental Gardens on Lindale Road.
The Council is the Local Lead Flood Authority responsible for surface water and ground water flooding in the County. As part of this remit, the Council has been developing flood alleviation measures for Grange-Over-Sands.
Phase 2 works involve the construction of a new laying a 710mm OD PE rising main 170m long from the pumping station within the Windermere Road car park into the carriageway of Windermere Road, crossing Lindale Road and into the Ornamental Gardens to discharge into the pond; (note the civil work has been constructed by others as part of Phase 1). It will be necessary to complete the outstanding civil works to the pumping station and continue with pump installation and commissioning.
grossbudgetlc: 650000

Originaltext


More information: Klicken Sie hier
Diese Ausschreibung dient nur zur Information.